Thursday, May 16, 2019

Completed [email protected] Report

NATIONAL GENERAL CERTIFICATE Candidate report pathfinder (2009 specification) UNIT NGC3 THE HEALTH AND SAFETY PRACTICAL APPLICATION Student number Location Date of recap Introduction including overview of ara inspected and activities taking place This report fol belittleds an inspection of the construct and yard located in . in order to meet the requirements of the Nebosh NGC 3 practical application. The atomic number 18as concerned with this inspection are the works make and one store in the yard and its immediate surrounding area.The building consists of a canteen area, an persona for admin duties, two toilets, a locker room, a drying/store room for personal protective equipment (PPE) and a minuscular store room. In the yard is one store for the storage of various step forwarddoor work materials and tools. The exposit are occupied by up to fifteen staff at any one time. stave work on a rotation of day and night shifts and the building is used for messing, completing wr iting work and planning work. The yard and store are used for loading and unloading vehicles with work equipment to rail for railway work.There were no fragments of staff on duty at the time of the inspection. Executive Summary Upon fulfilment of the inspection I found there were several areas of concern which lead to breaches of the wellness and Safety at Work Act (HSWA), the Regulatory Reform ( parent Safety) Order (RRFSO), the Manual Handling Operations prescripts, the perpl dischargey of Health and Safety at Work Regulations (MHSWR) and the Provision and Use of Work Equipment Regulations (PUWER). The health and safety of the employees who are victimization the premises may also be at risk if some of these concerns are not intercommunicate immediately.Failure to address these issues may lead to attention and possible enforcement action from the HSE and/or the Office of Rail Regulation (ORR). Breaches of statutory duty or failure to comply with improvement or prohibition not ices may ending in court action being taken which may lead to criminal prosecution and fines of up to ? 20 000 in a magistrates court and the possibility of up to 6 months imprisonment. A detailed translation of the findings is listed be first with reference to specific observations given in brackets.Main findings of the inspection Fire precautions The Regulatory Reform Fire Safety Order (RRFSO) requires that fire fighting arrangements must be provided in the oeuvre (18). Although there are fire extinguishers located throughout the building there is an absence of any extinguisher in the office. accordingly there is an urgent requirement to agree extinguishers inst completelyed here as employees would be in extreme endangerment if a fire were to start in the office. The RRFSO also states that fire exits must remain stop from obstructions at all times (1).The PPE blocking the fire exit is not only creating a tripping stake but it is putting the health and safety of the employe es at risk of becoming trapped in the building if a fire were to start. Management of Health and Safety Many of the observations are the result of a pathetic Health and Safety worldly concernagement system which could easily be rectified by members of staff and at a very low cost to the organisation. (2,3,8,10,12). Use of rail steel as doorstops presents a pregnant risk of slips, trips and falls and is a very easy problem to rectify.Other house staying issues such as tangle cables, hand cleaners being stored near eating and beverage utensils and overflowing waste paper bins are all issues that get out present a very poor image to visitors but are low cost and not time consuming problems to resolve. These issues may also be in breach of the Management of Health and Safety at Work Regulations 1999. PPE. Issues The Personal Protective Equipment regulations state that all PPE must be suitably stored and maintained (1, 14). The PPE blocking the fire exit must be re go and all the middle-aged PPE in the store room should be disposed of and replaces as it is no longer fit for purpose.The roll of tobacco in the drying room (6) also needs urgent attention as its purpose is to dry out PPE used by employees in wet weather conditions. With the heater not functional this has an impact on the ability to maintain the PPE to a good standard. PUWER Issues The Provision and Use of Work Equipment Regulations state that employers must consider that all work equipment is suitable, maintained and inspected (7, 17). The old fax machine in the office has been out of use for quite some time with service tags out of date and there has been no effort to have it fixateed or replaced.It is creating a tripping hazard as well as breaching PUWER. A similar perspective has arisen regarding the water dispenser in the canteen. The employees have shown their concerns about not being able to use the machine and it is in serious need of repair or replacement. This is also creating a we lfare issue which must be addressed. Manual Handling Issues There are some issues concerning heavy materials being stored at ground take (13, 20). This is in breach of the Manual Handling Operations Regulations 1992 and presents a high risk of a RIDDOR harm to employees lifting or moving these materials.As suggested these materials must be stored correctly and at waist level to prevent injuries from curve and lifting. This will prevent high costs through RIDDOR incidents and loss of productivity. Conclusions The building and yard are all of modern design with full refurbishments having been carried out as recent as 2007. Many of the hazards found were as a result of a lapse in general Health and Safety management and many of the observations could be rectified by simple maintenance and tidying up of the building and yard.This is a very low cost practice which in turn could improve the Health and Safety of the workforce. The employees have all had a very good level of workplace sp ecific Health and Safety training with certificates on debunk on the notice board. However this training counts for little if it is not put into practice on a daily basis. It appears there have also been many bad habits picked up over the years such as poor general housekeeping. Employers and employees should take pride in a clean and safe workplace and it also sets a good example to any visitors or potential clients.A safe workplace will also reduce the risk of accidents and ill health to employees and in the long run save silver from unnecessary claims, losses of production and a poor corporate image. Recommendations Recommendation Likely resource implications priority Target date Fire exit door should remain free PPE to be removed from exit area and signs to spunky Immediate from obstructions at all times. (1) be erected advising to keep clear. Fire extinguisher to be installed in New fire extinguisher, ? 30, easy to install byHigh Immediate the office. (18) a member of s taff. Heater in drying room must not be Wall brackets to be replaced, 1-2 man hours toHigh 1 week used until it is re-attached to the fit and reinstate heater to wall, approx cost wall. 6) ? 50. Arrange for repair or replacement of Repair could be very expensive, more practicalHigh 1 week drinking water dispenser. (17) option may be to replace. ?200 approx. man hour to install. pull away battery chargers from government agency Install an extra plug socket to prevent strong suit 1 month when not in use, and establish bettertangling cables under chairs. Electrician for layout of cables. (8) 1 hour plus parts. 50 approx Arrange for a repair to be carried Hire of a welder for 1 hour. ?50 approx. middling 1 week out on the entrance handrail. (23) Dispose of old office swivel chair Order the correct replacement chair. ?30-40 Medium 1 week from canteen. 22) Bracket for wall mounted first aid New bracket approx ? 10 and less than 1 man Medium 1 week kit to be replaced. (12) hour to install. terminate cut-offs of rail steel from Source correct doorstops or fit latches to theMedium 1 month doors and keep doors closed whenever walls.Approx cost ? 15 to fit. 1 man hour. possible. (2) Yard store flooring to be change of General clean up and disposal of any disused Medium 1 week thence review each obstructions to gain access to and waste materials. 2 staff hours month shelving. 21) Steel plates to moved from the yard 1-2 staff hours to store on shelving, Medium 1 week then review each 3 area into the store and stored on preventing injuries from lifting heavy plates months shelving at waist height. (20) at ground level. Remove spray cans and all outdoor General clean up of office by staff.Keep allMedium 1 week then review each work equipment from office area. (9) areas around and under desks free from month clutter. 1-2 hours Install correct hand wash dispenser Dispenser costs ? 5 and takes l ess than 1 man Medium-Low 1 month in canteen. (4) hour to fit.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.